CACGCosta Azul
EN · ES
Vertical civic buildout with boom lift
Southern California · Design-Build Contractor

Built right. Built safe. Built by the crew.

A self-performing federal design-build contractor delivering across active, coastal, and mission-critical facilities.

Why we exist

We build for the agencies that cannot tolerate failure.

Federal mission-critical infrastructure does not forgive shortcuts. Waterfronts, active installations, public venues. The cost of getting it wrong is paid by the people who use the place we built.

So we self-perform. Civil, structural, roofing, finish, landscape. Every craft runs in-house. One prime. One signature. One closeout.

The team is the asset. The crew is the company. Every site, every shift, every day.

If the spec calls for it,

/

we build it.

Safety record

Every site. Every shift. Every crew. EM-385 compliant on the ground, every day.

0.00
OSHA DART rate · 3 calendar years running
EM-385
USACE-compliant on every federal site
100%
Past-performance projects delivered on schedule

A leadership-driven safety culture means proactive hazard identification, disciplined field controls, and craft professionals trained beyond the minimum. Every site, every shift. The record is the system, not luck.

Our approach

Four phases. One signature. No handoff gaps.

01

Pre-construction

Constructibility, scheduling, estimating, and risk assessment before a shovel hits the ground. The bid reflects the build.

02

Design-build

One prime carries design risk and construction risk under one signature. Owners get one point of accountability from kickoff to closeout.

03

Self-perform

Civil, structural, roofing, finish, landscape. Every craft in-house. We do not subcontract the things our reputation depends on.

04

Closeout

Clean books. Punch list signed. PPQ filed. Lessons captured. The last day is treated with the same discipline as the first.

Our work

Federal infrastructure. Quietly delivered.

Hi-viz crew on a coastal site
Federal · Waterfront

Coastal Pier Facility

NAICS 237990 · Design-Bid-Build · Tidal-zone civil
Crew on a coastal exterior with boom lift
Active-base · Exterior

Mechanical & Finish Upgrade

NAICS 236220 · Design-Build · Occupied facility
Multi-story civic building under construction
Civic · Vertical

Multi-Story Civic Buildout

NAICS 236220 · Design-Build · Phased delivery
Bulk site preparation with skid-steer and geomembrane
Coastal · Civil

Site Preparation & Containment

NAICS 237990 · Design-Bid-Build · Geomembrane containment
Workers on roof membrane with safety equipment
Federal · Roofing

Roof & Life-Safety Systems

NAICS 238160 · Design-Bid-Build · Fall-protection plan
Designed planting bed and finished sitework
Sitework · Closeout

Sitework & Landscape

NAICS 238910 · Design-Build · Final-acceptance ready
Stainless commercial kitchen interior buildout
Federal · Interior Finish

Commercial Galley Buildout

NAICS 236220 · Design-Build · Stainless finish package
Heavy rebar grid and formwork on a port site
Federal · Structural

Reinforced Concrete & Formwork

NAICS 237990 · Design-Bid-Build · Port-side structural
Public bay walkway with hardscape and landscape
Public Works · Recreation

Bay-Front Public Walkway

NAICS 238910 · Design-Build · Hardscape + planting
Past performance

Federal-grade ratings. Exceptional + Very Good.

Exceptional and Very Good past-performance ratings across submitted federal and public-owner projects. Reliable schedule performance. Effective issue resolution. Consistent quality delivery in active, coastal, and mission-critical environments.

CPARS-style ratings · Federal & public owners
Markets

Where the work actually matters.

Multi-crew at excavation with skid-steer

Defense

Active installations. Restricted-access facilities. Coordination with mission-critical operations.

Civic building under construction

Civic

Schools, courthouses, public venues. Long lifecycles. Phased delivery without disrupting the people inside.

Hi-viz crew on a coastal site

Coastal & Waterfront

Piers, tidal facilities, USCG-class shore infrastructure. Environmental discipline at the waterline.

Aerial view of synthetic turf athletic field with playground, splash pad, and shade structures

Public Works & Recreation

Athletic fields, playgrounds, splash pads, community recreation. Design-build delivery, precision finish, public use.

Costa Azul crew on a coastal site
Our people

The crew is the company. Everything else is paperwork.

Self-perform by design

We self-perform because the people doing the work are the asset. Every craft on every project (civil, structural, roofing, finish, landscape) runs in-house.

Trained beyond the spec

Field leadership carries OSHA-30 or better. Foremen are certified beyond what the spec calls for, on every site, every day.

Built to stay

We retain the people we train. People who go home safe every night build differently than people who do not. That is the standard we hold the company to.

Request a brief

Tell us about the task order.

Five questions. One business day. We respond with whether we are the right prime, and if we are not, we tell you who is.